Proba-3
The Proba-3 mission, a groundbreaking initiative by ESA, consists of two spacecraft, the Occulter and the Coronagrapher, designed to showcase precise Formation Flying techniques.
The mission’s main objective is to capture detailed images of the solar corona by creating an artificial solar eclipse. The two spacecraft, separated by 150 meters, operates in a highly elliptical orbit with a perigee of 600 km and an apogee of 60,530 km.
A key part of Proba-3’s success was the Launch and Early Orbit Phase (LEOP), a critical stage where the spacecraft transitioned from launch to mission operations. The Ground Operations Manager (OM) played a vital role during LEOP, managing the ground stations network that supported the mission. The OM served as the link between the Flight Control Team (FCT) and the ground stations, ensuring smooth coordination to meet the mission’s objectives.
Preparing for Proba-3’s LEOP required careful planning and execution. Following the selection of the ground station network, the OM led the validation process to ensure the ground stations could reliably handle Proba-3’s requirements. This process included performance tests to check that all stations met mission standards, ensuring readiness for the LEOP, commissioning, and routine phases.
A major part of this preparation was the Mission Readiness Tests (MRTs), which started six weeks before LEOP. These tests verified the entire ground segment’s ability to support the mission, covering telemetry, telecommand, and other critical data services used to determine the spacecraft’s orbit. The MRTs had two key goals: to confirm the readiness of the ground station teams, and to train the Control Centre Staff for routine and emergency operations. The OM coordinated these tests, ensuring the procedures and ground segment were prepared to manage the challenges of operating two spacecraft.
During the MRTs campaign, operations were thoroughly tested to address the unique complexities of Proba-3’s two-spacecraft system. Managing two separate spacecraft required extensive preparation and precise coordination. This demanded a high level of skill and flexibility from the OM and the ground station teams.
After completing the MRTs successfully, the ground stations were validated, marking an essential step before the LEOP. During the LEOP period, from 05/12/2024 to 07/12/2024, the OM was the central figure, coordinating all ground station activities and maintaining communication with the Mission Control Team. This ensured smooth operations and rapid problem-solving, securing the mission’s success.
Project Details

The Proba-3 mission showed how important careful planning, testing, and teamwork are during the LEOP. Salah Nouri, our Ground Operations Engineer at Thorn SDS, along with other OM team members, played a key role in the mission’s success. Their efforts highlighted the strong collaboration between space agencies and industry partners, like Thorn SDS, to ensure smooth operations between the ground and space teams. This teamwork not only helped ensure the mission’s success but also provided valuable benefits to the client.
With its groundbreaking Formation Flying technology, Proba-3 set a new standard in satellite operations, paving the way for future missions to explore new possibilities in space.